At a glance

Powder coatWet paintBasis
Where it is appliedIn the coater's shop: powder is sprayed on, then cured in an oven.Mostly in the shop; finish coats can be brushed, rolled or sprayed on site.steelconstruction.info: spraying is most common in the shop; brushing and rolling more common on site.
Size limitThe coater's oven and pre-treatment line.The spray booth and handling, and on site the access.No figure found for either. Ask each coater for the largest part size and weight.
CureOven cure; Qualicoat UK & Ireland describes a 160 to 210 °C oven for aluminium.Air-drying and chemically curing types are both listed (air-drying alkyds; two-pack epoxies and urethanes).Powder temperature as read for TL-MET-21, not re-read. Paint types: steelconstruction.info.
Typical filmSteel systems of 80, 140 or 200 µm in one, two or three coats (Qualisteelcoat).Building examples of 140 to 300 µm over two or three coats (our sum of the listed coats).Qualisteelcoat 5.0.1 Annex 3; steelconstruction.info example systems.
Standards routeQualisteelcoat for steel, Qualicoat for aluminium; BS EN 13438 and 15773 for galvanised steel.BS EN ISO 12944-5:2019 systems, chosen by corrosivity category and durability.Qualisteelcoat 5.0.1 notes that ISO 12944 does not cover powder, so it borrows the categories.
Durability claimClasses C2 to C5 marked 'recommended' per system; the scheme says this is not a warranty.Low, medium, high, very high (up to 7, 7 to 15, 15 to 25, over 25 years) to first major maintenance.ISO 12944-1:2017 bands as printed by steelconstruction.info; neither is a guarantee.
Repair on siteThrough the coating supplier; rubbing or polishing can damage metallic and matt films.Recoatable finishes are listed for site application; touch-up by brush or spray.Qualicoat care sheet (TIS 1) as read for TL-MET-21; steelconstruction.info system tables.
ColourLimited to the powder maker's approved range; neither scheme says 'any RAL'.Not evidenced; one source says micaceous iron oxide has a limited colour range.Ask both coaters to match your reference and approve a sample.
Edges and detailFilm thins on sharp edges: radius to 0.5 mm and remove burrs (Qualicoat UK & Ireland).ISO 12944-3 covers design for coating; its edge rules were not read.Draw the edge you want and say who prepares it.
Hollow sections, welded assemblies, VOCsNot evidenced.Not evidenced.Put each question to the partner coater in writing.

Corrosivity categories C1 to C5 and durability bands are those of ISO 12944; see our sheet on corrosion categories. 'Not evidenced' means we found no source for the statement, not that it is untrue. Figures for powder are from the sheet on powder coating metalwork; the paint figures are examples for structural steelwork in buildings, not decorative metalwork.

Four questions that decide it

Start from the piece and the place, not the finish. The drawing gives four prompts. None of them names a winner on its own: they tell you what to settle with the partner coater before a price.

  1. Does the whole piece fit the coater's oven? A powder film is cured in an oven, so the oven sets the largest piece. We found no oven size for any coater: ask for the largest part size and weight, and for the pre-treatment line that comes with it. A piece too big can be coated in sections and assembled, which moves the problem to the joints; the other route is paint.
  2. Will it be cut, welded, drilled or fixed after coating? Anything done to the piece after it is coated damages the film. steelconstruction.info lists recoatable finish coats for application on site, and says brushing and rolling are more common on site; Qualicoat's care guidance sends powder repairs through the coating supplier. Agree the repair method and who does it before approving either process.
  3. Is it outside, damp or coastal? From category C3 upwards the coating is what protects the steel, so name the whole system, the corrosivity category and the durability you expect. For paint that is an ISO 12944-5 system; for powder, a Qualisteelcoat system or a galvanised-plus-powder system (duplex). A heated dry interior (C1) needs no corrosion coating; the choice there is about appearance and wear.
  4. Are there sharp edges, welds or fine detail on show? Powder builds thinly on a sharp edge, so Qualicoat advises a 0.5 mm radius and removal of burrs. Wet paint has its own detailing guidance in ISO 12944-3, which we did not read. Either way the coating does not hide a rough weld: see weld finish and visible welds.

If the answers do not settle it, ask two coaters for a coated sample each, on the same metal and by the route they would use, and compare them in the real light. That is the one test that does not depend on a source.

Four questions that lean towards powder coat, wet paint or eitherFour rows. Does the whole piece fit the coater's oven: yes, powder is possible; no, wet paint or coat in parts. Will it be cut, welded or fixed after coating: yes, agree the repair method first; no, either suits. Exterior, damp or coastal, category C3 or above: yes, name the whole system and durability; no, either, and a heated dry interior steel piece needs no corrosion coating. Sharp edges or fine detail: yes, radius edges to 0.5 mm first; no, either. At the foot: still undecided, ask two coaters for a sample each.YesNo1 Does the whole piece fitthe coater's oven?Powder is possibleWet paint, or coat in parts2 Will it be cut, welded orfixed after it is coated?Agree the repair methodEither process suits3 Outside, damp or coastal(category C3 or above)?Name system, durabilityEither (dry C1: no coat)4 Sharp edges, welds orfine detail on show?Prepare and radius edgesEither process suitsStill undecided? Ask two coaters for a sample each, on the same metal, and compare.
Four questions that lean towards powder, wet paint or either. Original drawing by Make Bespoke Studio; a prompt for the conversation with the coater, not a rule.

What each process is, and what the sources say

Powder coating is a dry powder sprayed onto a prepared surface and cured in an oven into a film. The schemes that govern it are Qualicoat for aluminium and Qualisteelcoat for steel, set out in our powder coating sheet. Qualisteelcoat's steel systems are 80 µm in one coat, 140 µm in two and 200 µm in three; one coat on bare steel is limited to category C2.

Wet paint here means a system of liquid coats: a primer, one or more intermediate coats and a finish. steelconstruction.info describes primers as metallic-pigmented (zinc-rich, the most commonly used of that type) or binder-reliant (such as two-pack epoxy), and lists two-pack epoxies and urethanes among the generic paint types. The paint standard is BS EN ISO 12944-5:2019, which picks systems by category and durability. Protection, the page says, is directly proportional to dry film thickness.

Two statements are worth keeping in view. ISO 12944 durability is the expected life to first major maintenance, not a warranty, and the Qualisteelcoat scheme says the same of its own ratings. And Qualisteelcoat notes that ISO 12944 does not cover powder, so the two sets of figures are not interchangeable: do not write a paint durability band against a powder system.

Example paint systems for steel in buildings

steelconstruction.info publishes standard systems for structural steel in buildings, with the nearest ISO 12944-5 system, the preparation, and the coating life. They are for structural steelwork, not for fine decorative metal, but they show how a paint system is written: a preparation, then coats, each with a film thickness. Primer thicknesses may include a prefabrication primer.

System (as numbered there)WhereCategoryCoating life, yearsPreparationCoats, film in µmSum, µm
IV-C2-BInterior, visibleC215Blast Sa 2½Zinc phosphate epoxy primer 80; alkyd finish 60140
IV-C3-CInterior, visibleC320Blast Sa 2½Zinc phosphate epoxy primer 120; aliphatic polyurethane finish 60180
IV-C3-BInterior, visibleC325Blast Sa 2½Zinc phosphate epoxy primer 80; epoxy MIO 100; polyurethane finish 60240
E-C3-BExteriorC320Blast Sa 2½Zinc phosphate epoxy primer 80; epoxy MIO 100; polyurethane finish 60240
E-C4-AExteriorC415 to 20Blast Sa 2½Zinc-rich epoxy primer 40; epoxy MIO 100; epoxy MIO 100 (site)240
E-C5-BExteriorC520Blast Sa 2½Zinc-rich epoxy primer 40; epoxy MIO 200 in all; polyurethane finish 60300

Three points from the source. The film thickness that counts is the dry film, which is the wet film multiplied by the percentage of volume solids. Readings below 80 per cent of the nominal thickness are unacceptable and those between 80 and 100 per cent pass only if the mean reaches the nominal; Qualisteelcoat sets a similar 80 per cent rule for powder, so one acceptance wording can serve both. And micaceous iron oxide (MIO) intermediate coats have a limited colour range, so the colour usually comes from the finish coat.

Galvanised steel: paint or powder over zinc

Hot-dip galvanised steel can be painted or powder coated; the result is called a duplex system. steelconstruction.info lists a mordant wash, an etch primer or sweep blasting as ways of preparing a galvanised surface for paint, and Qualisteelcoat's galvanised systems are marked up to C5 with two coats totalling 140 µm. Powder over galvanising has its own agreements standard, BS EN 15773:2018, between client, galvaniser, chemical supplier and coater. The zinc, the preparation and the coating are one system, so ask the partner to name who is responsible for the whole of it. See powder coating metalwork for the powder side and galvanic corrosion where other metals touch it.

Specification wording

Paste into your schedule or specification and replace anything in [square brackets] with your own figures. Wording is a starting point: your specification governs.

Paint system (steel)
Coating system to BS EN ISO 12944-5 for corrosivity category [C3], durability [High]. Preparation: blast clean to [Sa 2½ to BS EN ISO 8501-1]. Coats: [zinc phosphate epoxy primer 80 µm; epoxy MIO 100 µm; recoatable polyurethane finish 60 µm]; nominal dry film thickness [240] µm. Colour [RAL [ ]], gloss [ ] GU at 60 degrees. Partner to state the system, the paint maker's data sheet and the applicator in writing before pricing.
Powder system (steel)
Powder coating system [Qualisteelcoat 5.0.1, Annex 3] for category [C3]: [pre-treatment, primer and top coat in µm]; total [140] µm. Coater to state its scheme licence and the approved system in writing. See the sheet on powder coating metalwork for the full wording.
Acceptance and repair
Dry film thickness to be measured on the plan in [ISO 19840]: mean not below nominal, no reading below 80 per cent of it. Control sample [S-01] on [the same metal and route] signed [date]. Repair of damage after coating to be by [the coater / the paint maker's recoat procedure], agreed in writing before work starts, with a trial on [the sample].

Terms used on this page

Two-pack (2K) paint
A paint supplied as two parts, a base and a hardener, mixed just before use. Two-pack epoxies and polyurethanes (urethanes) are common in steel coating systems.
Micaceous iron oxide (MIO)
A flaky iron oxide pigment used in an intermediate paint coat, usually epoxy, to build film thickness and slow the passage of moisture. Its colour range is limited, so a separate finish coat gives the colour.
Dry film thickness (DFT)
The thickness of a coating once it has dried or cured, in micrometres (µm). Wet film thickness times the percentage of volume solids gives the expected dry film.

All metalwork terms

Standards and sources

Questions we are asked

Is powder coating better than wet paint?

Not in general. They suit different pieces: powder is a shop finish limited by oven size and repaired through the coater, wet paint can be applied or touched up on site and is specified to ISO 12944-5. Settle size, site work, exposure and edges first.

Can powder coating be touched up on site?

Qualicoat's care guidance says repair is through the coating supplier, and warns that rubbing or polishing metallic and matt finishes can discolour or change the gloss. Agree the repair method with the coater before you approve powder for a piece that will be altered on site.

Which finish for an exterior steel balustrade?

From category C3 up the coating protects the steel, so name the whole system: either a duplex system (galvanised plus powder) or an ISO 12944-5 paint system, with the category and durability. Rain-washed inland steel is usually C2 to C3; a coastal site can reach C5. See our sheet on corrosion categories.

Will wet paint match my powder colour?

We found no source that says. Give each coater the colour reference and ask for a coated sample on the same metal, then compare them together in the real light. Gloss should be given in gloss units at 60 degrees.

What is 2K polyurethane and MIO?

2K, or two-pack, means a base and a hardener mixed before use. Polyurethane is a common finish coat for outdoor resistance. MIO is micaceous iron oxide, a flaky pigment in an intermediate epoxy coat that builds film; because its colour range is limited the finish coat sets the colour.

How is thickness checked on each?

Both are measured as dry film. A common acceptance rule for each is that the mean reaches the nominal figure and no single reading falls below 80 per cent of it. Say how many readings and where.

Download the factsheet