At a glance
| Item | What to hold | Size it from | Must match |
|---|---|---|---|
| Upholstery cloth or leather | A spare cover set, or a cut length from the run; seat inserts if they are replaceable. | Identical seats on the schedule, and how often covers are cleaned or replaced. | Same dye lot or hide batch. Keep a snip with the lot number. |
| Finish touch-up | A touch-up kit for each finish code. | Finish codes and rooms, and the high-touch positions. | Same batch and recipe as the control sample. |
| Hardware and fixings | Hinges, runners, catches, handles, castors, glides, adjusters, and any special screws, cleats and brackets. | Installed count of each type, and which parts wear or fail first. | Same reference and finish code. Runners as matched pairs. |
| Panels, tops and doors | A spare door, drawer front or top for the hardest-wear positions, only where agreed. | The cost and time to re-make one later, set against the cost now. | Same veneer or board batch and finish. A later match is by sample. |
| Glass and handmade parts | Spare elements, shades or inlays. | Ask the maker for a number for each type, made in the same run. | Same colour and run. A re-make may differ. |
| Lamps and drivers | One spare of each lamp and driver type. | The luminaire schedule. | Same model and version. Parts are discontinued. |
| Floor boards, tiles, slabs | Boards, tiles or panels from the same batch, kept boxed. | The area laid, and the cost of a later re-match. | Same batch, grade and finish. |
No standard sets spare quantities. Each quantity comes from the order, the owner’s brand standard or franchise agreement, and what the part would cost and take to re-make later.
Why spares are ordered with the run
A bespoke run is made as one batch. The cloth comes from one dye lot, the lacquer from one mix, the hides from one set, the veneer from one flitch and the hardware from one revision. A year or two on, that batch is gone, and a replacement is matched to a sample, not to the original. Cloth and finishes drift between batches: see metal finish sample approval and batch variation, and fabric and leather yardage, which says to order the whole quantity from one lot. Spares made with the run are the pieces most likely to match, which is why they are specified at order and not after opening.
Three things sit above any rule of thumb.
- The owner’s documents. A brand standard, franchise agreement or property improvement plan can set the spares, the replacement cycle or both. Ask for them before you size anything.
- Whether the supplier can re-make the piece. For each item, ask whether it can be re-made, for how long the drawings, patterns and finish records will be kept, and what it would need to match. The handover pack is where that record lives.
- The contract. Whether spares are priced as lines in the order, who owns them, where they are held and who insures them are contract matters: see warranty, guarantee and defects liability. Spares are not a warranty remedy.
The drawing shows why the kinds of spare differ. Soft goods are replaced as a new run, so the spares made with run 1 are only useful until then. Hardware, touch-up material and case goods spares keep their value across several soft goods runs.
Sizing spares when there is no standard
No standard or trade guide we found gives spare quantities. Supplier guides publish percentage ranges, but they cite no source and say themselves that the figures vary by project, so this sheet gives none. Size each line from the order instead.
- Sort the parts by what happens to them. Some wear out (glides, castors, soft furnishings), some fail (runners, hinges, gas lifts, drivers), some are damaged (panels, glass, tops) and some are lost (keys, loose fixings).
- Count what is installed of each type, from the FF&E schedule, not the number of rooms. Using one hardware reference across room types reduces the number of spare types.
- Choose a basis for each line: a fixed count, a share of the installed number, or one for each room type. Write the basis in the schedule beside the quantity, so a reviewer can see why.
- Weigh now against later. A spare costs money, storage and a record now. A missing one costs a re-make, a wait and perhaps a mismatch later. Handmade and short-run items tip the balance towards ordering with the run.
- Phase them. On a phased handover, deliver each phase’s spares with its batch and label them by phase.
Then put the answer in a schedule. This is a template; the entries are placeholders.
| Ref | Component | Used on | Installed | Spare, and its basis | Batch or lot; finish code | Kept where, by whom |
|---|---|---|---|---|---|---|
| S-01 | [Drawer runner, soft close] | [C-10 to C-14] | [ ] pairs | [ ] pairs; basis [share of installed] | [Lot ref; runner ref R-450] | [Engineering store; head of maintenance] |
| S-02 | [Touch-up kit, finish F-03] | [All oak veneer items] | [1 finish] | [ ] kits; basis [one for each finish] | [Batch ref; recipe ref] | [Engineering store; head of maintenance] |
| S-03 | [Spare cover set, fabric T-02] | [Banquette B-01] | [ ] seats | [ ] sets; basis [one for each [ ] seats] | [Dye lot no.] | [Housekeeping store; housekeeper] |
Add a column for the re-order reference if your supplier gives one. The schedule belongs in the specification and in section 05 of the handover pack.
Replacement cycles: what the numbers are for
A replacement cycle is not set by a standard. It comes from an owner’s brand standard, a lender or an operator’s own plan, and every published figure we found answers a different question. This table says what each is for, so that none is quoted as a rule.
| Source and edition | What it says | What it is for |
|---|---|---|
| RICS whole life carbon assessment standard, 2nd edition, version 3 (August 2024), Table 20 | Loose furniture and fittings 10 years; carpet or vinyl 7 years; lighting fittings 15 years. To be replaced by scenarios based on the actual life of the items. | Modelling replacements in a carbon assessment. An indicative default for the UK, not a replacement plan. |
| NPCR 026 Part B for furniture, version 3.0 (EPD Norway, 8 October 2024), Table 2 | A default reference service life of 15 years for indoor seating, tables, storage and beds. The producer declares an estimated service life, which is not a warranty or a guarantee. | The basis on which furniture EPDs are compared. A modelling assumption. |
| One hotel franchisor’s 2025 franchise disclosure document, as reproduced by an aggregator | Soft goods replaced at least every 7 years and case goods at least every 14. A reserve of up to 5 per cent of gross revenue may be required. | That brand’s franchised hotels (a US document). A brand standard, not a general rule. |
| Two supplier guides (2025 and 2026) | Soft goods 3 to 7 years, or 6 to 7 for a full branded refresh; case goods 10 to 14 years. No sources given. | Marketing guidance. Indicative only. |
They disagree (10 years against 14 for case goods, 7 years against 3 to 7 for soft goods) because they answer different questions: a carbon model needs a default, a brand needs a rule for its estate, and a supplier needs a sales line. None is a measurement of how long your piece lasts.
What moves a real cycle is closer to home:
- The owner’s documents, including any brand standard, property improvement plan, management agreement or lender requirement. Where a brand sets a fixed cycle, it can apply regardless of condition.
- How hard the space is used. A corridor, a lobby and a guestroom wear at different rates, and so do a sun-facing window seat and an interior banquette.
- How the piece is built. Covers that can be removed, cushions that can be re-made and finishes that can be touched up stretch a cycle; see finishes on timber joinery for which finishes repair well.
- Care and maintenance, which the handover pack should make possible.
The FF&E reserve is the money an owner sets aside to pay for these replacements. Its rate is set by the lender, the brand or the management agreement. The one disclosure document extract we read allows the franchisor to require up to 5 per cent of gross revenue; a UK owner’s figure will be its own. For a designer, the useful step is to write the intended cycle into the brief and to specify so that soft goods can be replaced without replacing the case goods.
Labelling, storing and handing over
- Label each spare with the item code, finish code, batch or lot number, date made, supplier reference and the schedule line it serves.
- Pack and store to suit the material. Cloth and leather flat or rolled, dry and out of light; finishes in sealed, dated containers (their shelf life is for the finish maker to say); panels and glass in their own packing. For glass and other fragile parts, see packing, shipping and installing glass chandeliers.
- Check them on delivery against the schedule for count and condition, with a photograph, as you would for the main delivery.
- Record them in section 05 of the handover pack and in the asset register, with where they are kept. For lighting, the lighting handover sheet and LED drivers for decorative luminaires cover lamps and drivers.
- Decide who holds them. The owner’s engineering or housekeeping store is the usual place. If the supplier holds them, agree for how long, who insures them and how they are released. These are contract terms.
Specification wording
Paste into your schedule or specification and replace anything in [square brackets] with your own figures. Wording is a starting point: your specification governs.
With the main order [Supplier] is to supply the spares in Schedule [number], made in the same run and from the same batch of [fabric, finish, hardware] as the installed work. Each is to be packed separately and labelled with item code, finish code, batch or lot number, date and supplier reference, and delivered [with the main delivery / to [store address]] by [date]. They are to be counted against the schedule on delivery and recorded in section 05 of the handover pack. Spares do not replace or reduce any warranty or guarantee given under [contract reference].
For each scheduled item [Supplier] is to state whether it can be re-made after handover, the reference, finish code and sample needed to match it, and how long it will keep the drawings, patterns and finish records: [ ] years. Any re-order lead time is information, not a commitment.
The owner's replacement cycle is [soft goods [ ] years; case goods [ ] years], set by [brand standard / property improvement plan / management agreement, reference]. [Designer] has specified [item] for an intended service life of [ ] years in [use]: a design assumption, not a warranty.
Terms used on this page
- Attic stock
- Extra finished items or materials from the same batch, kept by the owner after handover to replace damaged or worn pieces later. The quantities and storage are agreed in the specification.
- FF&E reserve
- Money set aside regularly, often as a percentage of hotel revenue, to pay for replacing furnishings over time. The rate and the replacement cycle are normally set by lenders, brands or the management agreement.
- Property improvement plan
- A list of upgrades a hotel owner must carry out, set by the brand or franchisor when a hotel joins or renews, often covering FF&E replacement. It can dictate cycles and specifications.
- Soft goods and case goods
- Soft goods: textiles and upholstery (covers, cushions, curtains, often carpet). Case goods: hard furniture such as bed frames, desks and cabinets.
Standards and sources
- RICS: Whole life carbon assessment for the built environment, 2nd edition, Version 3 (August 2024): Table 20; read 6 Nov 2026.
- NPCR 026 Part B for Furniture, version 3.0 (EPD Norway, 8 Oct 2024): Table 2; read 6 Nov 2026.
- No standard applies: no standard found for spare quantities or replacement intervals.
Questions we are asked
How many spares should I order for a hotel FF&E package?
No standard sets it. Size each line from the schedule: the installed count of each part, which parts wear or fail first, and what a later re-make would cost and delay. Any percentage you see online is a rule of thumb from a supplier or consultant, and the ones we read cite no source. The owner’s brand standard or franchise agreement may also set quantities.
What is attic stock?
Extra finished items or materials from the same batch as the installed work, kept by the owner after handover to replace damaged or worn pieces later. The quantities, labelling and storage are agreed in the specification.
How often are hotel soft goods and case goods replaced?
It depends on the owner’s brand standard, the use and the build. The figures we found disagree because they have different purposes: a carbon standard uses 10 years for loose furniture and fittings, one franchisor’s document requires soft goods at least every 7 years and case goods every 14, and supplier guides give 3 to 7 and 10 to 14 years. Treat them as ranges, and ask the owner.
Why order spares with the main run and not later?
A later batch is unlikely to match. Dye lots, lacquer mixes, hide sets, veneer flitches and hardware revisions all change, and a replacement is then matched to a sample. Spares made with the run share its batch.
Are spares the same as a warranty?
No. Spares are extra stock you can use. A warranty or guarantee is a written promise, with its own terms, in the contract. Spares should not reduce or replace one.
Who should own and hold the spares?
The contract decides. In practice the owner usually holds them in its own store, labelled and listed in the handover pack. If the supplier holds them, agree for how long, who insures them and how they are released.
What is an FF&E reserve?
Money an owner sets aside regularly to replace furnishings over time, often as a percentage of revenue. Lenders, brands and management agreements set the rate and the cycle; this sheet gives no rate.
Download the factsheet
A two-page A4 PDF with the spares table, the lifecycle drawing, the sizing steps and clause wording to paste into your specification.