Compliance guidance. This sheet deals with how to brief a moulding. It gives no cutter costs, prices or lead times: those depend on the partner workshop and the profile. Where the building is listed, whether work needs consent is for the local planning authority; this is not legal advice, so confirm with your conservation officer or adviser.

At a glance

ItemWhat to giveWithout it
1:1 section drawingThe profile at full size, with the lines that must match markedThe maker guesses which curves matter
EnvelopeThe largest section the stock can be, in millimetresStock is cut too big or too thin
DatumWhere the profile starts: floor, ceiling, rail or lining, and which face is the referenceA profile set from the wrong face
MaterialSpecies or board, grade, moisture and whether solid, veneered or built upA match in the wrong timber looks different painted or stained
FinishPaint, stain, oil or lacquer, and sheenFinish hides or exaggerates the profile
Lengths and quantityRun lengths, total metres, spares, and the longest single length allowedWaste and joints are decided on site
Corners and jointsMitre, scribe, cope or block; where joints may fallVisible joints in the wrong place
FixingHow it is fixed and to what, and whether fixings may showMouldings split or fixings telegraph
Existing sample or templateA short piece, a traced template or a gauge print, labelled with where it came fromA match with nothing to match to
PhotographsSquare-on, with a rule or scale bar in frame, lit from the sideDimensions cannot be read from a photo
Evidence requiredAny fire or sustainability evidence the project needsA supplier cannot provide it after the event

Eleven items. Process stages and cost drivers follow; no cutter cost or lead time is given because we hold no partner figures. Content is general practice, flagged for a partner joiner to confirm.

Four jobs, four briefs

People say “custom moulding” for four different jobs, and the brief changes with each:

  • A new profile from a drawing. You own the design. The brief is the 1:1 section and the checklist below.
  • A match to an existing moulding. The existing piece is the specification. The brief is the template and the evidence of where it came from, plus the checklist.
  • An extension of an existing run. As a match, but the junction between old and new is the critical detail and needs a hold point.
  • A stock profile with changes. A catalogue profile altered in size or depth. Name the starting profile and mark the changes on the drawing.

In every case the drawing governs, not a description in words. For a match, say which is the reference: the template, the drawing from the template, or the old piece itself.

The brief: what to send

One page, drawn full size, does most of the work. The drawing shows the lines to include; the table at the top of the page lists every item.

A one-to-one profile sheet with its envelope and notesA profile drawn full size inside a dashed rectangle showing the largest section the stock can be. A vertical hatched strip on the left is the wall. Numbered balloons mark the fixing face, the face that shows, the envelope, the datum to the floor and the mitre end, and a key on the right says what each means.12345Drawn full size (1:1). Dashed line = largest section.1Fixing face: how it sits on the wall2Visible face: the lines that must match3Envelope: the most the stock may be4Datum: where it starts (floor, ceiling, rail)5End: mitre, scribe or return
A one-to-one profile sheet with the envelope (dashed), the datum and the lines that must match. Schematic. Original drawing by Make Bespoke Studio.

Taking a template on site

The aim is a record that can be laid against the old moulding again, not a description. Common methods, which can be combined:

  • A contour gauge. A row of thin sliding pins pressed square against the moulding takes its shape. Trace it onto card, cut the card and check it against the moulding.
  • A short length. Take a short piece from a hidden place, such as behind a cupboard or above a lowered ceiling, if the building and any consent allow it.
  • Photographs. Square-on to the end of a cut or a mitre, with a rule in frame and light from the side. Useful as a check; not enough alone, because lenses distort.
  • A cast or scan. Some workshops take a cast or a scan of a complex profile. Ask the partner what they can use.

Label each record with the room, the wall and the height, and keep the template: it is the reference for the first-off sample.

Taking a profile from a moulding with a contour gaugeFour steps drawn left to right. One, a row of thin pins pressed against the moulding takes its shape. Two, the gauge is laid on card and the outline traced. Three, the card is cut out and its edge compared with the moulding. Four, the cut-out is held to the moulding to check for gaps of light.1 Press the gauge on2 Trace onto cardcard3 Cut the templatetemplate4 Check for light gapslight = not a match yetSchematic. Keep the template, photograph it with a rule, and send both.
Taking a profile with a contour gauge and checking it. Schematic. Original drawing by Make Bespoke Studio.

Mind the paint, and the room

Old mouldings have usually been painted many times. Each coat rounds the arrises and part-fills the grooves, so a trace taken from the painted surface is not the profile the joiner made. If you can, take the template where the paint is thin (an unseen end, a back edge) or after a small test patch has been stripped, and say which you did. Old work also varies along the run: it may be hand-worked, out of true or later altered, so name the place the template came from and mark any variation on the drawing.

How paint build-up changes a traced profileTwo copies of the same architrave section. On the left the bare timber with sharp edges and a narrow groove. On the right the same section under many coats of paint, with softened edges and the groove filled, and the true timber outline dashed inside. A trace taken from the painted surface would not match the timber.Stripped timberPainted many timessharp edges, open groovesofter edges,groove filleddashed = the timberSection through an architrave; schematic, not to scale.
The same section stripped and under many coats of paint. Schematic, not to scale. Original drawing by Make Bespoke Studio.

From drawing to wall: the hold points

The stages below are the usual order. How long each takes is the partner workshop’s information and varies with the profile, so we give no durations: ask the partner and put the dates in the programme. The point of the table is where you should stop and approve.

StageWhat happensHold point (who signs)
1. BriefYou send the 1:1 section, the checklist items and, for a match, the templateDesigner
2. Profile drawingThe partner redraws the profile from your information and returns itDesigner approves the drawing
3. ToolingThe cutters or knives for the profile are made (or a stock profile is altered)Partner; no sign-off needed unless the drawing changes
4. First-off sampleA short length is run and compared with the existing moulding or the drawingDesigner approves against the existing, in place if possible
5. ProductionThe run is made, finished as specified and packedPartner quality check; designer if any length is queried
6. FitLengths are fixed, mitred and scribed on siteSite; check the first corner and the first junction with old work

Treat the first-off sample as the approval, not a formality: hold it against the existing moulding at the junction, in the room, before the full run is made. If a revision is needed after tooling, say so at once: the knives may have to be made again.

What moves cost and time

We do not publish cutter costs or lead times: the partner workshop quotes them for your profile. What changes them, in words:

  • Profile complexity. A profile that needs several cutters, passes or hand work costs more than a single-cutter profile.
  • Length of run. Tooling is a one-off cost spread over the run, so a short run carries the same set-up as a long one.
  • Material. Hardwood, softwood, MDF and built-up sections behave and cost differently; see the moulding materials sheet.
  • Waste. Odd sizes, long lengths and grain matching leave offcuts.
  • Revisions. Each change after tooling can mean new knives and another sample.
  • Finish and fit. Painting, staining, scribing and fitting on site are separate work.

Old and listed buildings

Where the building is listed, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 prohibits works for the demolition of a listed building, or for its alteration or extension in a manner that would affect its character as a building of special architectural or historic interest, unless the works are authorised. The section does not itself mention interiors. Local authorities explain the practical line differently: several say like-for-like repair does not need consent while others require it for anything that is not exactly like for like, and say it is for the planning authority, not the owner, to judge. Ask the conservation officer before the order is placed, and ask for the answer in writing if there is doubt. BS 7913:2013, a guide to the conservation of historic buildings, is listed by BSI as current; we did not read it. A match that is meant to read as new, or one meant to be indistinguishable, is a conservation decision: record which you chose.

Saying how close is close enough

“To match” is not a tolerance. State the match point and the allowance: for example, the profile to match the approved template within a stated distance at the arris lines, checked on the first-off sample at a named junction. Because the old piece varies, the allowance belongs to the template, not to the building. General joinery tolerances are on our joinery tolerances and scribing sheet.

Specification wording

Paste into your schedule or specification and replace anything in [square brackets] with your own figures. Wording is a starting point: your specification governs.

Bespoke profile line
Ref [M-01]: moulding, profile as detail [D-30] at 1:1, envelope [90 x 25] mm, datum [top face to ceiling]. Material [ ]. Finish [ ]. Total length [ ] m plus [ ]% spares; longest single length [ ] mm. Corners [mitred / scribed]. First-off sample to be approved by the designer before the run.
Match to existing
Ref [M-02]: moulding to match the existing in [room], from template [T-02] taken on site on [date] at [location], paint [stripped / not stripped]. Profile to match the approved template within [ ] mm at the arris lines. First-off sample to be held against the existing at the new and old junction in [room] and approved before production.
Listed building
The building is [Grade ] listed. Work to the existing mouldings is subject to consent from [the local planning authority]; the contractor is to confirm the consent position in writing before any moulding is removed or replaced.

Terms used on this page

Profile
The shape of a moulding seen in cross-section, which is what has to be drawn, matched and cut.
Contour gauge
A tool with a row of thin sliding pins that take the shape of a moulding when pressed against it.
First-off sample
The first length run from new tooling, kept for approval before the full run is made.
Datum
The face or line a profile is measured from, such as the floor, the ceiling or a rail.

All joinery terms

Standards and sources

Questions we are asked

How do I match an existing skirting board profile?

Take a template with a contour gauge, ideally where the paint is thin, trace it onto card, label where it came from and photograph it with a rule. Send the template with a 1:1 drawing, and ask for a first-off sample to hold against the existing before the run is made.

What should I send a joiner to make a custom moulding?

A full-size section with the lines that must match, an envelope, a datum, the material, the finish, the lengths and quantity, the corner details, and any template or sample. The at-a-glance table in this sheet lists all eleven items.

Can a profile be copied from a photograph?

Not reliably. A photograph square-on with a rule is a useful check, but lens distortion and perspective make it a weak specification. Use a template or a short sample as well.

How long does a custom moulding take, and what does it cost?

It depends on the profile and the partner workshop, so this sheet gives no figures. Ask the partner for a lead time and a cost for the actual profile, and record the dates for the drawing, the first-off sample and the run in the programme.

Does a like-for-like moulding repair in a listed building need consent?

It depends on the work and on the local planning authority. Section 7 of the 1990 Act requires authorisation for works that would affect the building's character, and authorities draw the line differently, so ask the conservation officer before work starts. This is not legal advice.

Download the factsheet

A two-page A4 PDF: the eleven-item brief checklist, the hold points from drawing to wall, how to take a template, and wording for a schedule.

Factsheet TL-JOI-37 v1.0 (PDF)