At a glance
| Question | Answer | Where it comes from | Note |
|---|---|---|---|
| FD30S | 30 minutes of integrity to BS 476-22, with S for restricted smoke leakage. The European form is E30 Sa. | ADB App. C, C1, C2 | Table C1 prints both. The FD column goes on 2 Sept 2029. |
| Flat entrance door from a shared space; protected stairway enclosure | E30 Sa (FD30S) | Table C1, 2(a), 4(a) | A self-closing device is needed (C5). |
| Any other protected corridor; corridor sub-division | E20 Sa (FD20S) | Table C1, 5(b), 7 | BWF advises FD30 with seals: a trade view. |
| Door in a cavity barrier; access to an external escape route | E30 (FD30) | Table C1, 8, 6 | No Sa suffix. A compartment wall between buildings: door as the wall, 60 minutes at least (item 1). |
| What counts as proof | Test evidence or assessment for the complete installed assembly, with certificate and label. | C1, C4 | A small change in detail can change the rating. |
| In use, blocks of flats | Residents told yearly; flat entrance doors checked yearly and shared fire doors quarterly in blocks over 11 m. | SI 2022/547, reg. 10 | In force 23 January 2023. England only. |
England only. Read from Approved Document B (2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments) on 5 November 2026.
What a fire door is, and how to read its label
A fire door is not a door that is thick or heavy. It is a doorset: leaf, frame, seals, hinges, closer, lock and glazing that were tested together, are certified together and are fitted as the installation instructions say. Approved Document B asks for a minimum fire resistance, in minutes, for each position, and says the test evidence must apply to the complete installed assembly, because small differences in detail may significantly affect the rating (paragraph C4).
Two notations. FD30 is the older British form: thirty minutes of integrity when tested to BS 476-22, with an S added where restricted smoke leakage at ambient temperature is needed (C1(a)). The European form is E30 Sa: E for integrity, thirty minutes, Sa for smoke leakage at ambient temperature, tested to BS EN 1634-1 (fire) and BS EN 1634-3 (smoke) and classified to BS EN 13501-2 (C1(b)). Table C1 prints both side by side and notes that national classifications do not necessarily equate with European ones, so a product cannot normally assume a European class unless it was tested for it. The Approved Document asks for integrity (E) only; it does not ask for insulation (C2), and it observes that fire doorsets often give no significant insulation (C8).
What S and Sa ask for. Table C1 note 2: unless the doors are protected by pressurisation to BS EN 12101-6, an S or Sa door should either have a leakage rate not over 3 m³ per metre per hour (from the head and jambs only) when tested at 25 Pa under BS 476-31.1, or meet the Sa classification when tested to BS EN 1634-3.
FD20 or FD30. The Approved Document asks for 20 minutes in some places and 30 in others. The BWF Fire Door Alliance takes the view that an FD30 door with intumescent seals should be specified as the minimum even where 20 minutes is required, and says its scheme members no longer test and sell an FD20 door without seals (Fact Card 9, September 2024). That is a trade body’s position, not a requirement of the Approved Document.
Standards behind the notation. Each line records what we saw, not what the standard says.
| Standard | What it covers | What we saw on 5 November 2026 |
|---|---|---|
| BS 476-22:1987 | Fire resistance of non-loadbearing elements; source of the FD notation | BSI Knowledge lists it as current. One search summary reported a listing as withdrawn, which we could not confirm. Approved Document B removes this route from 2 September 2029. |
| BS EN 1634-1:2014+A1:2018 | Fire resistance test for door and shutter assemblies and openable windows | Current, under review (BSI Knowledge, published 31 August 2018). Used with EN 1363-1. |
| BS EN 1634-3 | Smoke control test for door and shutter assemblies | Named in Approved Document B. We did not see its status. |
| BS EN 13501-2:2023 | Classification from fire resistance and smoke control test data (E, EI, Sa) | A standards seller lists the 2023 edition as current (published 9 June 2023) and as replacing the 2016 edition. BSI Knowledge still showed the 2016 edition, withdrawn on 9 June 2023. |
| BS 8214:2026 | Code of practice: specification, design, installation and maintenance of fire-resisting and smoke control doors | Current, published 20 March 2026, replacing BS 8214:2016 (BSI Knowledge). Approved Document B paragraph C14 names BS 8214 without an edition. |
Where each rating applies: Table C1
Table C1 of Approved Document B sets the minimum rating by position. The table is the same in Volume 1 (dwellings) and Volume 2 (buildings other than dwellings). The rows below are condensed; the paragraph numbers are the table’s item numbers. The fire strategy for the project can ask for more than the table, and the fire engineer or building control body decides which row applies to a given door.
| Position of the doorset | European class | BS 476-22 | Item |
|---|---|---|---|
| Compartment wall separating buildings | As the wall, 60 minutes at least | As the wall, 60 at least | 1 |
| Compartment wall separating a flat from a space in common use | E30 Sa | FD30S | 2(a) |
| Protected shaft forming a stairway or evacuation shaft, above ground, in flats, other residential, assembly and recreation or office buildings | E30 Sa | FD30S | 2(b) |
| Other protected stairway or evacuation shaft; lift or service shaft; other compartment walls | Half the wall’s period, 30 minutes at least (Sa for stairways); as the wall for other walls, plus Sa for progressive horizontal evacuation | The same, with S | 2(c), (d), (e) |
| Compartment floor | As the floor | As the floor | 3 |
| Enclosure of a protected stairway or evacuation shaft | E30 Sa | FD30S | 4(a) |
| Enclosure of a lift shaft that is not a protected shaft | E30 | FD30 | 4(b) |
| Protected lobby approach or protected corridor to a stairway or evacuation shaft; protected lobby approach to a lift shaft | E30 Sa | FD30S | 5(a), (c) |
| Any other protected corridor | E20 Sa | FD20S | 5(b) |
| Giving access to an external escape route | E30 | FD30 | 6 |
| Sub-dividing corridors connecting alternative exits; dead-end portions of corridors | E20 Sa | FD20S | 7 |
| Any door within a cavity barrier | E30 | FD30 | 8 |
| Enclosure to a protected entrance hall or protected landing in a flat | E20 | FD20 | 9 |
| Place of special fire hazard; ancillary accommodation in care homes | E30 | FD30 | 10 |
| Dwellinghouse to garage | E30 Sa | FD30S | 11(a) |
| Protected stairway in a single family dwellinghouse; other fire-resisting construction in a dwellinghouse | E20 | FD20 | 11(b), (c) |
Around the table, Appendix C also says:
- Self-closing (C5, C6). All fire doorsets, including flat entrances, should have a self-closing device, except fire doorsets to cupboards, to service ducts normally locked shut, and within flats and dwellinghouses. Where self-closing would interfere with use, a door may be held open by a fusible link (not on a means of escape unless C7 is met), by an automatic release linked to the fire detection and alarm system, or by a door closer delay device.
- Hinges (C10). Unless shown to be satisfactory when tested as part of the doorset, the essential components of a hinge on a fire door should be made entirely from materials with a melting point of at least 800°C.
- Signs (C11, C12). Fire doorsets should carry a sign to BS 5499-5 (‘Fire door keep shut’, ‘Fire door keep locked shut’ or ‘Automatic fire door keep clear’) on both sides, except doors to and within flats and dwellinghouses, bedroom doors in ‘residential (other)’ premises and lift doors.
- Openings (C8). Unless a door gives both integrity and insulation as the wall requires, no more than 25 per cent of the length of a compartment wall should consist of door openings.
- Guidance named (C14, C15). BS 8214 for non-metallic leaves, a TRADA publication for timber doorsets, a DSMA code of practice for metal doors, and ‘Hardware for Fire and Escape Doors’ from the Door and Hardware Federation and the Guild of Architectural Ironmongers, because hardware can significantly affect performance in a fire.
From 2 September 2029. The 2029 amendments to Approved Document B replace Appendix C: the Table C1 column for BS 476-22 goes, the table gives the European classification only (for example ‘30 minutes Sa’), and doorsets may be classified to BS EN 13501-2 or have their performance assessed as capable of meeting a classification under paragraphs B1 to B5. The 2022 to 2026 text continues to apply to work that has already started or been notified, on the transitional terms in the booklet.
The evidence: what makes a doorset a fire door
What makes a door a fire door is paper as well as timber. The documents below are the chain from the test to the door on site. Ask for them for the exact doorset on the schedule, before manufacture, not after.
| Document or mark | What it tells you | What to check |
|---|---|---|
| Certificate from a third-party certification body | That the design was tested and that the maker’s quality, production and traceability are audited, which BWF says goes beyond the test itself (Fact Cards 9 and 10) | That it names the exact leaf, frame, seals, ironmongery and glazing, and the finish. Scheme names are in our notes. |
| Test evidence or assessment | A test to BS EN 1634-1 classified to BS EN 13501-2, or, from 2029, an assessment (Appendix C, C1 and C4) | That it applies to the complete installed assembly: C4 says small differences in detail may significantly affect the rating. |
| Field of application, data sheet | What the tested design allows: leaf size, frame material, density and stop, seal types, gaps (BWF Fact Card 11) | That the project’s leaf, frame, veneer, size and gaps are inside it. |
| Installation instructions | How the doorset must be fitted, including the fire stopping between frame and wall | That the installer has them and follows them (Fact Card 10). |
| Label or plug in the leaf | The rating and certification number; traceability back to the certificate | That it is present, and has not been removed or painted over (Fact Card 10). |
| Hardware schedule | Which hinges, closer, lock, latch and seals are listed as tested | That nothing unlisted has been substituted (Fact Card 10; Appendix C15). |
| Handover record | As-built plan showing the fire doorsets, and the door register that later checks start from | Approved Document B Section 17 (2025 amendment, 17.4(c)) lists fire doorsets, and those with a self-closing device, among what is shown. |
Gaps are certified, not designed. The permitted gap between leaf and frame is set in the leaf’s field of application, and the installation instructions repeat it (BWF Fact Cards 10 and 11). The figures that circulate are not design figures. BWF Fact Card 11 gives, as a general guide, 2 to 4 mm along the sides and head and, for the bottom, usually 8 to 10 mm, or 3 mm where smoke control is also needed, and says to check the manufacturer’s instructions and the data sheet. The government’s fire door guidance for blocks of flats (revised August 2025) calls 4 mm the industry standard for the most a gap should be, other than at the bottom, as a visual check on a door already in service. Neither is a figure to write on a drawing: the certificate for your doorset governs.
Things that void a certificate. The BWF cards are direct about four: planing or cutting the leaf or frame to suit the opening; fitting a new leaf into an old frame without checking the frame against the leaf’s data sheet (Fact Card 11); glazing on site, where its certified doors must come from the maker already glazed (Fact Card 10); and swapping in hardware or seals that the certificate does not list.
When the design is not a standard doorset. A veneered face, an oversize leaf, special glazing or unusual ironmongery may sit outside what a certificate covers. Our reading of Appendix C and the BWF cards is the ladder below: the further a door departs from its certificate, the more evidence it needs. Who may give the written confirmation or carry out the assessment is a question for the certification body and a fire door specialist, and is not answered by any document we read.
What changed from 2022 to 2029
Several things changed between 2022 and 2026. Only the first two are law for owners of blocks of flats; the others are guidance and standards that a specifier will meet.
| Date | What changed | Source |
|---|---|---|
| 16 May 2022 | Section 1 of the Fire Safety Act 2021 came into force for England. The Fire Safety Order now applies to the structure, external walls and common parts of a building with two or more sets of domestic premises, and to all doors between the domestic premises and common parts. | Fire Safety Act 2021, s.1; commencement note (SI 2022/544) |
| 1 December 2022 | Approved Document B amendments (June 2022) took effect: secure information boxes and evacuation alert systems for taller blocks of flats, external wall changes. Appendix C was not replaced in the booklet we read. | ADB amendments booklet, June 2022 |
| 23 January 2023 | The Fire Safety (England) Regulations 2022 came into force (made 17 May 2022). Regulation 10 covers fire doors. | SI 2022/547, regulations 1 and 10 |
| 2 March 2025 | Approved Document B amendments: Section 17 on fire safety information was replaced (fire doorsets and self-closing fire doorsets go on the as-built plan), and national reaction-to-fire classes were removed. | ADB 2025 amendments |
| 8 August 2025 | The government’s fire door guidance under the 2022 Regulations was revised, with a new foreword and changes to 2.4 and 6.7. | gov.uk guidance, change history |
| 20 March 2026 | BS 8214:2026 was published, replacing the 2016 edition. The trade press reports a wider scope (timber, steel, aluminium and composite doors), a changed approach to evidence and a strengthened installation clause. | BSI Knowledge; FPA news, 23 March 2026 |
| 2 September 2029 | Approved Document B amendments take effect, removing national classes for fire resistance: the FD notation and BS 476-22 route leave Table C1. | ADB 2029 amendments |
What regulation 10 asks. It applies to a building with two or more sets of domestic premises and common parts through which residents would need to evacuate, in England. The responsible person must tell residents that fire doors should be kept shut, that they must not tamper with self-closing devices and that faults are to be reported, when a resident moves in and then within each twelve months (10(1) to (3)). In such a building above 11 metres, the responsible person must use best endeavours to check flat entrance fire doors at least every 12 months, keep a record of the steps taken, and check fire doors in communal areas at least every 3 months, including that the self-closing devices work (10(4) to (7)).
What it does not ask. The August 2025 revision says plainly that the Regulations are not meant to make existing flat entrance doors meet the current standards for new doors, that the checks are simple and visual, and that they assume the door’s design and installation were already adequate. For a designer the practical point is the record: a door register that says what each door is, where it is and what certificate it carries is what any later check starts from.
Not covered here. Hotels, offices and other buildings with no domestic premises are outside regulation 10 and fall under the Fire Safety Order’s general duties; Wales, Scotland and Northern Ireland have their own documents. Take both to the project’s fire engineer.
Who supplies the door, and what the schedule should say
What the studio does and does not say. The studio coordinates manufacture of bespoke joinery through partner workshops. It does not certify fire doors, and this sheet does not claim that the studio or its partner workshops supply certified fire doorsets. Where a project needs fire doors, the question for any supplier is which certified doorset, from which certified maker, and the certificate is the answer. If a bespoke finish or detail is wanted on a fire door, raise it at tender with the door maker.
On the door schedule, for each fire door:
- The position and the rating from the fire strategy (for example [E30 Sa] or [FD30S]), with the Table C1 item it comes from.
- That it is supplied as a complete certified doorset, and the certificate reference once chosen.
- Finish, size, glazing, vision panel and ironmongery, each marked as inside or outside the certificate.
- Self-closing device, hold-open method (if any) and the sign required.
- That no leaf or lining is planed, scribed or cut on site, and who fits the door.
- What goes in the handover record: certificate, field of application, installation instructions, as-fitted gaps and the date.
The leaf is also an access door: the clear width the regulations measure is not the leaf width, and a certified leaf has its own size limits. The door sizes and tolerances sheet covers the access figures; the fire documentation matrix lists what to ask for across the whole schedule.
Specification wording
Paste into your schedule or specification and replace anything in [square brackets] with your own figures. Wording is a starting point: your specification governs.
Fire doorsets to [positions on fire strategy drawing, ref [ ]] to achieve [E30 Sa / E30 / E20 Sa] ([FD30S / FD30 / FD20S]) as Approved Document B Table C1 item [2(a)] and the project fire strategy, tested to BS EN 1634-1 [and BS EN 1634-3 where Sa is required] and classified to BS EN 13501-2, and supplied as a complete doorset (leaf, frame, seals, hinges, closer, lock, latch and glazing as tested) with third-party certification. Hinges as tested. Certificate, field of application and installation instructions to be submitted before manufacture.
Any veneer, lacquer, size, glazing or ironmongery not covered by the doorset certificate to be identified at tender, with the certificate holder's written confirmation or an assessment report [reference]. No leaf or lining to be planed, scribed or cut on site; no existing frame reused unless checked against the leaf's data sheet.
Self-closing devices to all fire doorsets except [cupboards, ducts normally locked shut, doors within flats]. Signs to BS 5499-5 on both sides unless exempt (ADB C12). Labels or plugs not to be removed or painted over.
Door schedule for the O&M manual: position, rating, certificate reference, installer, date fitted and as-fitted gaps for every fire doorset, in the form [ ].
Terms used on this page
- FD30S
- A fire door that withstands fire for 30 minutes (integrity) when tested to BS 476-22; the S suffix means it also limits smoke leakage at room temperature. In the European system the equivalent notation is E30 with an Sa classification.
- Intumescent seal
- A strip fitted in the door or frame that swells when heated to close the gap around a fire door. BWF's position is that it should be fitted on every fire door.
- Integrity (E)
- How long a doorset keeps flames and hot gases from passing through it, in minutes. Table C1 asks for integrity, not insulation.
Standards and sources
- Approved Document B volumes 1 and 2, 2019 edition with the 2020, 2022, 2025 and 2026 amendments, and the 2029 amendments (England): Appendix C, Table C1, Section 17. Read 5 Nov 2026.
- The Fire Safety (England) Regulations 2022, SI 2022/547: regulations 1, 3 and 10; in force 23 January 2023.
- Fire Safety Act 2021, section 1: in force for England 16 May 2022.
- gov.uk fire door guidance under the 2022 Regulations: revised 8 August 2025.
- BWF Fire Door Alliance Fact Cards 9, 10 and 11 (September 2024): trade body guidance.
- BS 8214:2026; BS EN 1634-1; BS EN 13501-2:2023; BS 476-22: status only; not read. Confirm the current edition.
Questions we are asked
What is the difference between FD30 and FD30S?
Both are 30 minutes of integrity when tested to BS 476-22. The S means the doorset also limits smoke leakage at ambient temperature. Approved Document B Table C1 asks for the S version at, for example, a flat entrance off a shared space and the enclosure of a protected stairway, and the plain FD30 for a door in a cavity barrier. The European forms are E30 Sa and E30.
Should I write FD30S or E30 Sa?
Table C1 currently prints both, and says national classifications do not necessarily equate with European ones, so a door tested to one cannot normally assume the other. From 2 September 2029 the guidance gives the European classification only. Name the classification the doorset certificate carries, and the position it serves.
Can a bespoke veneered or oversize door be a fire door?
Only if the test evidence, or an assessment, covers that exact build. Approved Document B paragraph C4 says the evidence must apply to the complete installed assembly, because small differences in detail may significantly affect the rating. Ask the door maker and the certification body whether the veneer, size, glazing and ironmongery are inside the certificate. This sheet does not claim that the studio or its partner workshops supply certified fire doors.
What did the 2022 changes mean for fire doors?
The Fire Safety Act 2021 brought the doors between flats and common parts within the Fire Safety Order in England from 16 May 2022. The Fire Safety (England) Regulations 2022, in force from 23 January 2023, added duties under regulation 10: tell residents about fire doors, and in blocks over 11 m check flat entrance doors yearly and shared fire doors quarterly. The government revised its guidance in August 2025 to say the checks do not require existing doors to meet current new-door standards.
What gap should a fire door have?
The gap on the certificate. It is set in the leaf's field of application and repeated in the installation instructions. BWF gives general figures of 2 to 4 mm at the sides and head and usually 8 to 10 mm at the bottom, and government guidance uses 4 mm as the most a gap should be when checking a door in service, but none of these is a design figure.
Who is responsible for checking fire doors in a block of flats?
The responsible person for the building, under regulation 10 of the Fire Safety (England) Regulations 2022, where the building has two or more sets of domestic premises. The checks are simple and visual, and need not be done by a specialist, but repair or replacement of a fire door must be done by a competent contractor.
Download the factsheet