At a glance
| Check | Measure or confirm | Test or rule | Usually held by |
|---|---|---|---|
| Loading and parking | Vehicle size, where it can stand, restrictions, time windows, waste and keys | Ask the building and local authority early: bays and cranes may need booking or a licence | Contractor, building manager |
| Entrances and doors | Clear opening width and height, leaf open to 90 degrees; threshold | Smallest cross-section, packed, must clear the opening with room for hands | Designer, contractor |
| Corridors and corners | Narrowest clear width; the clear width each side of every corner | Corner test: L up to 2.83 x a minus 2 x w, for equal widths | Delivery team |
| Stairs and landings | Width between handrails, headroom, landings, number of turns | Corner test at each turn; headroom at the lowest point | Delivery team |
| Lift | Car width, depth, height; door opening; rated load; booking | The door opening is usually the limit; weight under the rated load | Building manager |
| Final room | Floor-to-ceiling height where the item is stood up; door width | Tip-up test: ceiling higher than the diagonal of H and D | Contractor |
| Hoist or crane | Opening size, packed weight, a place for the vehicle, licence, plan | Planned by a competent person (LOLER 1998, regulation 8) | Lifting contractor |
| Floors and finishes | Finish state, protection, point loads from trolleys and heavy pieces | Protect before anything heavy moves; floor loads are an engineer's question | Contractor, engineer |
All dimensions are clear dimensions measured on site, in millimetres. The two tests are plane geometry for a rigid box carried level: a screening step, not a guarantee.
Survey the route, not just the door
Most failed deliveries are decided before the piece is made. The drawing shows the finished item in its room; it does not show the stair it must climb, the corner it must turn or the lift it must ride. A delivery access survey follows the route the item takes, from the vehicle to its final position, and records the narrowest, lowest and tightest point on it. Those points, not the front door alone, decide whether an item can arrive whole.
Survey with the item's real sizes in hand: its three overall dimensions, the same dimensions in its packaging, and its weight. If it is not yet drawn, use the overall sizes on the drawing, and ask the maker for the packed sizes and weight, which are not the finished ones. Our process checks access routes, floor protection and lift dimensions before delivery day (see our delivery page), and the same measurements feed the site survey and the site readiness check.
Two tests you can run with a tape and a calculator
Test 1: turning a corner. Carry the item flat and level into a right-angle corner between two passages of equal clear width a. An item of length L and plan depth w (its size seen from above) turns the corner only if L is no more than 2.83 x a minus 2 x w. A table top 1,200 mm wide and 40 mm thick has a plan depth of 1,200 mm flat but about 40 mm on edge, which is why carrying it on edge turns much tighter corners (and needs the height to do it). Add the packaging to w, and keep room for hands.
| Passage width a | Item depth w = 50 | Item depth w = 300 | Item depth w = 450 | Item depth w = 600 |
|---|---|---|---|---|
| 800 mm | 2,160 mm | 1,660 mm | 1,360 mm | 1,060 mm |
| 900 mm | 2,440 mm | 1,940 mm | 1,640 mm | 1,340 mm |
| 1,000 mm | 2,720 mm | 2,220 mm | 1,920 mm | 1,620 mm |
| 1,100 mm | 3,010 mm | 2,510 mm | 2,210 mm | 1,910 mm |
| 1,200 mm | 3,290 mm | 2,790 mm | 2,490 mm | 2,190 mm |
Longest item L, in mm, that turns a right-angle corner between two passages of equal clear width a, by plan depth w. Rounded down to 10 mm. For a corridor of 900 mm, an item 300 mm deep can be up to 1,940 mm long; at 600 mm deep, 1,340 mm.
Where the two passages differ, as when a corridor of 1,200 mm leads to a doorway 800 mm wide, the same test applies with a figure for each side. There is no short formula for that case, so take a worked example: an item 300 mm deep can be up to about 2,200 mm long. A doorway is only as deep as the wall, so treating it as a long passage errs on the safe side.
Test 2: standing it up. A tall item delivered lying down is stood up by rotating it about a bottom edge. As it rises, its far top corner sweeps to a height equal to the diagonal of the item's side, the square root of (H squared plus D squared), where H is the height and D the depth. The clear ceiling height where it is stood up must be greater than that diagonal. Measure to the lowest thing overhead: a bulkhead, a sprinkler pipe or a light fitting.
| Item height H x depth D | Diagonal as made | Diagonal with [50] mm of packaging on each face |
|---|---|---|
| 2,100 x 500 mm | 2,160 mm | 2,290 mm |
| 2,300 x 600 mm | 2,380 mm | 2,500 mm |
| 2,600 x 600 mm | 2,670 mm | 2,790 mm |
| 2,400 x 900 mm | 2,570 mm | 2,700 mm |
Diagonals rounded up to 10 mm. A 2,300 x 600 mm carcase needs 2,380 mm under the lowest obstruction, and 2,500 mm if it is stood up in its packaging. The [50] mm is an example: use the packed size the maker gives you.
What the tests do not cover.
- They treat the item as a rigid box carried level. Real moves can tilt an item, stand it on edge or take it through a window, which can allow more. Handrails, skirtings, door stops, radiators and pipes allow less.
- They are geometry only. The people carrying need room for hands and shoulders; the delivery team sets that allowance.
- When a result is within [ ] mm of the limit, make a full-size template of cardboard or plywood at the packed size and carry it along the route.
- Weight matters as much as size. See the section on lifting below.
The route checklist, from kerb to room
Walk the route in the order the item travels, and write down the narrowest point of each stage. Photograph each tight spot with a tape in the picture.
| Stage | What to check | What to record |
|---|---|---|
| Kerb and building | Where the vehicle can stand, loading bay or parking, any permit or suspension, time windows, distance from the vehicle to the entrance, security and access control. | Vehicle size the site allows; bay or permit reference; time window; contact. |
| Entrance and doors | Clear opening width and height with the leaf open to 90 degrees, any step or threshold, automatic doors, whether a leaf can be taken off. | Clear width x height; step height; whether the leaf can be removed, and by whom. |
| Route on the level | The narrowest clear width, noting radiators, handrails, trunking and pipes; every corner, with the clear width on each side of it; floor finish and what protects it. | Narrowest width and where it is; a and b at each corner. |
| Stairs and landings | Clear width between handrails, headroom above the stair line, landing width and depth, winders, number of turns. For stair geometry see the stair rise, going and headroom sheet. | Width; headroom at the lowest point; landing size; turns. |
| Lift | Car width, depth and height inside; clear door opening width and height; the rated load on the plate; booking, protection of the car lining, out-of-hours use. | Car W x D x H; door opening W x H; rated load; booking reference. |
| Final room | Floor-to-ceiling height where the item will be stood up, lowest overhead obstruction, door width, floor finish complete and protected, space to turn. | Ceiling height at the standing position; the lowest obstruction. |
| After delivery | Where packaging goes and who removes it, waste removal, who holds keys, where any loose parts are stored. | Names and times. |
Hoists, cranes and heavy items
When an item is too large or heavy to carry, it goes by hoist, crane or other lifting equipment. Two duties come from the law we have read:
- Lifting equipment. Regulation 8 of the Lifting Operations and Lifting Equipment Regulations 1998 says every lifting operation involving lifting equipment must be properly planned by a competent person, appropriately supervised and carried out in a safe manner.
- Carrying by hand. Regulation 4 of the Manual Handling Operations Regulations 1992 says an employer must, so far as reasonably practicable, avoid the need for employees to do manual handling that risks injury. Where it cannot be avoided, the employer must assess it using the factors in Schedule 1 (the task, the load, the working environment and individual capability) and reduce the risk.
HSE's guidance on planning lifting operations (updated 29 October 2024) adds that routine lifts may be planned by the people doing them, while a complex lift needs a written plan from a person with significant and specific competencies, and that loads should not be suspended over occupied areas where that can be avoided. HSE's manual handling page (updated 25 March 2024) notes that the law sets no specific weight limits.
You do not plan the lift, but you do decide whether one is needed, and the sooner the better. A crane needs a place to stand, a plan and sometimes a licence: one London borough, for example, requires a licence to use a crane on or over the public highway and asks for applications at least 15 working days ahead, while other authorities have their own rules and periods. Give the maker and the contractor the packed weight and size of the item, and the opening it must pass, as soon as they are known. Floor loads from heavy pieces and trolleys are a question for the structural engineer, not a figure to guess.
Whole, in sections or knocked down: decide before the drawings are signed
If the survey shows a tight route, the usual answer is to change the item, not the building. Where a finished piece cannot travel whole, it is developed in sections that join on site. A site joint is a compromise on a finished surface, so it is better planned on the drawing than improvised at the door. Whether a piece can be made in sections depends on its construction, its finish and the workshop, so ask the maker; the table lists the questions, not what any workshop offers.
| Item | Options to ask the maker about | What the survey must then check |
|---|---|---|
| Tall wardrobe or storage wall | Carcases made to be assembled in the room, or built whole. | Stair turns for each carcase; ceiling height for any item stood up. |
| Large dining or boardroom table | A top in two or more parts with a joint made on site, or one top with a base that comes apart. | Door and lift opening against the largest part; floor protection. |
| Banquette or bench seating | Frames in lengths, with upholstery closed or finished on site. | Door width against the longest length. |
| Sofa or deep armchair | Whether legs or arms can come off, or the frame can be made in parts. Not every construction allows it. | Door width and the corner test for the packed size. |
| Reception desk or bar counter | Modules with joints made on site; stone or solid surface tops supplied in parts. | Weight per module against the lift and floors; where the joints fall. |
| Panelling and headboards | Flat panels fixed on site. | Panels carried on edge: headroom and corner test at plan depth w of the packed thickness. |
| Metal frames and screens | Welded whole, or bolted in sections that are finished after assembly. | Finish damage at the joints; who touches in. |
What to send the maker
- A marked-up plan of the route, with the narrowest points and every turn measured.
- Photographs of each tight spot, with a tape in the picture.
- The record sheet: clear widths and heights, lift sizes and rated load, ceiling heights.
- Loading arrangements, time windows, permits and contacts.
- The number of people the route allows to carry, and any floors, finishes or services that need protection.
- A request for the packed size and weight of every item, in return.
Specification wording
Paste into your schedule or specification and replace anything in [square brackets] with your own figures. Wording is a starting point: your specification governs.
Delivery to [address, floor and room]. Access route as marked on drawing [ref]: narrowest clear width [ ] mm at [location]; clear door opening [ ] mm wide by [ ] mm high; lift car [ ] mm wide, [ ] mm deep and [ ] mm high, door opening [ ] mm, rated load [ ] kg; stair [ref] with [ ] turns; floor-to-ceiling height at the standing position [ ] mm. Items are to be made, packed and delivered so that they can pass this route. Items that cannot pass whole are to be made in sections, with the site joints shown on the shop drawings.
[Contractor / designer] is to confirm the access dimensions on site on [date], as clear dimensions with doors open to 90 degrees and fixed obstructions in place. The maker is to tell [name] in writing within [ ] days of receiving the survey if any item cannot pass the route.
Deliveries on [days] between [times], loading from [bay, kerb or yard] booked by [party]; lift booked by [party] for [ ] hours. Licences for any crane, hoist or road occupation are obtained by [party]; lifting operations are planned by a competent person and the plan is issued to [party] [ ] days before the lift. Floors, walls, door frames and the lift car along the route are protected by [Contractor] before delivery. Packaging is removed by [party] on the day.
Where a shop drawing shows a site joint, the maker is to supply [fixings and jointing parts] and the joint is to be assembled and finished on site by [party]. Alignment, finish match and fixings are agreed on the shop drawing before manufacture is released.
Terms used on this page
- RAMS
- The pair of documents a contractor prepares before a task: the risk assessment of what could go wrong and the method statement of how the work will be done safely. Delivery and installation of heavy or fragile items normally needs them.
- Clear opening
- The unobstructed width and height an item can pass through: for a door, measured with the leaf open to 90 degrees, between the face of the open leaf and the stop on the opposite side, and between the head and the threshold.
- Packed size
- The overall dimensions of an item in its protective packaging. They are larger than the finished dimensions, and are the sizes that must pass the route.
- Tip-up diagonal
- The diagonal of an item's side, from its height and depth: the least ceiling height needed to stand the item up from lying down.
Standards and sources
- Lifting Operations and Lifting Equipment Regulations 1998, regulation 8: organisation of lifting operations (read 5 Nov 2026).
- Manual Handling Operations Regulations 1992, regulation 4 and Schedule 1: avoid, assess and reduce; the Schedule 1 factors (read 5 Nov 2026).
- HSE: Planning and organising lifting operations: page updated 29 Oct 2024, read 5 Nov 2026.
- HSE: Manual handling at work: page updated 25 Mar 2024, read 5 Nov 2026.
- Southwark Council: Crane licence: one London borough (updated 31 Mar 2026): an example, check your own authority.
- Make Bespoke Studio: Delivery and Installation: how delivery is coordinated.
Questions we are asked
How do I check that a large piece will fit through a door?
Measure the clear opening, not the door leaf: open the leaf to 90 degrees and measure from the face of the open leaf to the stop on the opposite side, and from the head to the threshold. Compare that with the item's smallest cross-section in its packaging, leaving room for hands. If the item then has to turn a corner, run the corner test too.
What is the longest item that will turn a corner?
For two passages of equal clear width a, carried flat and level, an item of plan depth w can be up to 2.83 x a minus 2 x w long. In a 900 mm corridor an item 300 mm deep can be up to 1,940 mm long, and one 600 mm deep up to 1,340 mm. Carrying a flat piece on edge reduces w.
Can a tall unit be stood up in the room?
Only if the clear ceiling height is greater than the diagonal of its height and depth, measured to the lowest thing overhead. A 2,300 mm tall, 600 mm deep carcase has a diagonal of about 2,380 mm, and about 2,500 mm in packaging.
When does a delivery need a crane or hoist?
When the route cannot take the item whole and it is too large or heavy to carry through the building, for example through a window or balcony opening. The lift must be planned by a competent person (LOLER 1998, regulation 8), and in some places a crane on or over the public highway needs a licence from the local authority. Raise it as soon as the survey shows the problem.
Should I ask for furniture to be made in sections?
If the survey shows a tight route, yes, and decide before the drawings are signed so that the site joints are drawn and the finish is planned. Not every piece can be sectioned: ask the maker what the construction allows.
Who carries out the access survey?
Whoever can get into the building: the contractor, the designer or the delivery team, using a record sheet the maker has seen. The maker and the delivery team should have the measurements and photographs before a piece is released for manufacture.